Bouncie GPS Tracker for Vehicles with Real-Time Location
- Real-Time GPS Tracker Device for Vehicles — Ideal for personal use or fleet management, this car GPS tracker provides up-to-the-minute location updates. Our car tracking device also provides unlimited trip history, including a detailed route history
- Driving Insights — Our OBD tracker for cars monitors speed, acceleration, hard braking, idle time, and more. This versatile family and fleet GPS tracker for cars also helps improve road safety by sending alerts in response to unsafe driving practices
- Vehicle Health — Unlike other vehicle tracking devices, our car tracker device continuously monitors diagnostic engine data, alerting you to potential maintenance issues, so you can avoid downtime and keep fleet and family vehicles in peak condition
- Geo-Fencing & Accident Detection — Set up geo-fences to receive notifications when your vehicle enters or exits designated areas; Equipped with advanced sensors and software, this vehicle tracker device instantly detects impacts and sends SMS alerts
- Easy To Install & Low Monthly Subscription — Our OBD GPS tracker for vehicles plugs directly into OBD2 ports and works on most vehicles 1996 and newer; $9.65 monthly subscription required - no hidden activation or return fees - cancel anytime
- Comprehensive Trip Recording — Track every trip with detailed information including routes, addresses, idle time, speed data, and driving patterns. Color-coded speed bands and indicator icons help visualize safe driving habits
| Compatible Devices | Android, Apple iOS, Desktop Browser |
| Special Feature | No Battery Required, Coverage: North America [US, CN, MX], Data Retention: Unlimited, Mapping Technology: Google [Street & Satellite], Wireless Technology: 4G LTE CAT M1 See more |
| Manufacturer | Bouncie |
| Unit Count | 1 Count |
| Specific Uses For Product | Vehicle tracking and monitoring |
| Brand | Bouncie |
| Number of Items | 1 |
| Connectivity Technology | 4G LTE Cellular |
| Global Trade Identification Number | 00860227001514 |
| Item Weight | 1.28 Ounces |
| Country of Origin | USA |
| Item Dimensions | 1.75 x 1.87 x 1 inches |
| Additional Features | Coverage: North America [US, CN, MX], Data Retention: Unlimited, Mapping Technology: Google [Street & Satellite], No Battery Required, Wireless Technology: 4G LTE CAT M1 |
| Supported Application | Location Tracking, Route History, Speed Monitoring, Accident Notification, GeoFence |
| Item Highlight | Route History, Speed Monitoring, Driving Insights, Geo-Fence, & Accident Notifications. No Contracts. Cancel Anytime. |
| Product Type | GPS Trackers |
| Built-In Media | OBD2 | Telematics | GPS | 4G LTE |
| Enclosure Material | Plastic |
-
Save 10% when you buy two or more items.
-
Get 5% off your next purchase.
-
Enjoy free delivery on orders above $200.
-
Orders are processed and shipped from Washington
3-6 days (Domestic)
Confidence-backed purchases with 30-day return support.
USD |
BRSWGGTRBUNGCFD6 |
Category |
GPS, Finders & Accessories , GPS Trackers |
Tags |
Stay connected and informed about your vehicle’s location with the Bouncie GPS Tracker. This device offers comprehensive tracking and insights, providing peace of mind whether you’re monitoring a single car or managing a fleet.
Key Highlights
- Real-Time Tracking: Receive up-to-the-minute location updates directly to your device.
- Unlimited Trip History: Access detailed route history for every journey, allowing you to review past trips.
- Driving Insights: Monitor key driving metrics like speed, acceleration, braking, and idle time to improve driving habits.
- Geo-Fencing Alerts: Set up virtual boundaries and receive notifications when your vehicle enters or exits designated areas.
- Accident Detection: Get alerted in the event of an accident, providing immediate assistance.
Useful Facts
- Coverage: North America (US, CN, MX)
- Data Retention: Unlimited
- Mapping: Street & Satellite
- Connectivity: 4G LTE Cellular
- Power: No Battery Required
Good Fit For
- Families wanting to monitor vehicle location.
- Fleet managers needing vehicle tracking and management.
- Individuals seeking to improve driving habits and safety.
- Anyone needing to track a vehicle’s movement and location.
Product details












Shipping & Delivery
At GofinchKart Australia, we aim to deliver your order quickly and safely.
Domestic Shipping (Australia):
Orders are typically delivered within 3–7 business days.
International Shipping:
Estimated delivery time is 12–26 business days, depending on the destination and customs processing.
Once your order has been dispatched, you will receive a tracking number. Delivery times may vary during public holidays or due to unforeseen delays.